We teamed up with City Point Partners and the MBTA to create a video detailing the upcoming North Station Draw One Bridge replacement.

The project includes replacement and modernization of the existing drawbridge, replacement of a control tower, an extension of the bridge platform adding tracks 11 and 12 to the network, and upgrades to track, signal, communications, and infrastructure.

It’s a significant project currently in the design phase, and City Point and the MBTA wanted to create this video to spread awareness and educate the public on the project.

We captured footage of the location, interviewed project team members, and spliced in historical, current, and design footage of the Draw One Bridge to give Boston commuters an inside look at the work to come.

Recent Projects

Explore Our Project Success Stories

A black TAC-STIM device is shown next to bold green and white text reading "HOW TO USE TAC-STIM" on a gray background.
Training Videos
Healthcare

Training video: electroCore

Training videos are not one size fits all, and at ...
Learn More
Large digital sign with blue background displays the words “The World Can’t Wait” alongside a globe icon, viewed from below inside a modern building.
Conference videos
Healthcare

BIO Conference

BIO, the largest international biotech conference, was a while ago, ...
Learn More
Two men in business attire stand under a Brasseler USA booth at a convention or trade show, engaged in conversation. Industrial lighting and other booths are visible in the background.
Conference videos
General

Conference Coverage: AAE

We regularly cover conferences here at path8, and we challenge ...
Learn More

Stay Informed and Inspired

Subscribe to our newsletter
for exclusive updates

Go to Top